WestConnex is comprised of three stages:
The WestConnex O&M Contractor was engaged to provide pre-operational services to the project, including input into the design of the scheme and participation in the operational readiness procedures, followed by the operation and maintenance of WestConnex M4 and M5 over a term of 10 years (inclusive of the pre-operations phase).
Our Advisor was the Contract Manager/ Transaction Manager for the procurement of the O&M Contractor for this iconic project. Services delivered by our Advisor included:
Our Advisor coordinated inputs from the project team, including O&M advisors (e.g. SWTC development) and legal advisors (e.g. deeds schedules). In addition, our Advisor managed the interfaces between the O&M contract and other parties, including D&C and tolling contracts, and supported the risk process throughout the procurement phase in conjunction with SMC.
The development of technical and commercial requirements for WestConnex M4 & M5 O&M was complex, and required detailed consideration of the integrated operational requirements for what will be one of the longest road tunnels in the world, which is to be operated and maintained by a single O&M Contractor, under three separate contracts, which were drafted to suit the separate concession ownership of each of the three stages of WestConnex.
Our Advisor was an influential member of the integrated project team throughout the procurement process and ensured that the O&M Contractor was procured within the required tight timeframe of 9 months to enable it to provide important operational input into the D&C design process.
Key early successes associated with the services provided by our Transaction Advisors include: